there were no violations observed, |
collaboration with Forest Department |
undertaken in partnership |
developed in collaboration |
|
Sprinklers, dust collectors, wind breaking sheets, green belt etc. being significant in keeping air pollution around |
within the quarry area to support biodiversity in spite of the fact that natural grown trees and less |
with the Forest Department, focusing on enhancing biodiversity |
with the Forest Department within the quarry area to support biodiversity, |
|
the quarry or stone crushing sites in |
pollution exist in and around at the |
around the quarry site. |
alongside the presence of |
|
check. Hence, their maintenance is equally important, which should form |
Harinagar quarry site. Moreover. Necessary |
Despite the existing natural cover, additional |
naturally grown trees and the generally lower pollution levels |
|
part of the quarter report. |
directions were given to all quarry lease holders to sprinkle water, placing wind breaking sheets, green belt etc. for keeping air pollution in and around the quarry site in check and control. |
efforts are being made to create a sustainable environment in and around the Panchawati Quarry. |
around the quarry sites. Furthermore, necessary pollution control measures, including the maintenance of sprinklers, dust collectors and green belts, will be actively implemented to mitigate air pollution around the quarry and stone crushing sites. |
| 6. |
Social Responsibility: It Should be a mandated social responsibility of the units involved in quarry and stone
|
Necessary direction has been given to all quarry lease holders for properly maintaining
|
All quarry leaseholders have been instructed to enforce dust
|
Currently, no quarries are operational at Diglipur Tehsil. However, once
|
|
crushing operations, to |
adequate vegetation |
control |
quarry sites are |
|
properly maintain adequate vegetation round the periphery to |
around the periphery of quarry site to prevent the |
measures, such as regular water |
operational, necessary directions will be |
|
prevent the spread of dust/particulate |
spread of dust/ particulate matters |
sprinkling, the installation of |
issued to leaseholders to |
|
matter in the |
in the surrounding |
wind-breaking |
maintain |
|
surrounding area. |
area. Plans have been chalked out for re-grassing |
sheets, and the establishment of a green belt |
adequate vegetation around the |
|
|
disturbed area and planting vegetation |
around the periphery of |
periphery of the quarry sites to |