bidder should be an Indian Steam Generator and Steam Turbine Generator or the manufacturer of Supercritical Steam Generator. Alternatively, the bidder should be a EPC Contractor or be part of a consortium of not more than four members who shall satisfy the criteria indicated in paragraph 4.1.3. Paragraph 6.1 of the tender document made it clear that time was the essence of the contract. A detailed procedure was laid in the tender document for the submission as well as the processing of the tender. Paragraph 25.1 made it clear that there was no obligation for the first respondent to accept the lowest or any tender. The first respondent also reserved under paragraph 25.3, the right to relax or waive any of the conditions of the specification in the best interests of the first respondent. Paragraph 31 dealt with the evaluation of technical bids and paragraph 31.1 stipulated that the provisions of Tamil Nadu Transparency in Tenders Act, 1998 and the Rules framed thereunder would be followed. Paragraph 32 laid down the procedure for evaluation of price bids. As per paragraph 32.1.6, the Present Value of the project would be determined on the basis of cash flow of the EPC Price during the construction period, IDC, cost of owner's equity, loan drawals and debt service. Under paragraph 32.1.7, certain other factors such as Power Output, Steam Generator Efficiency, Turbine Cycle Heat Rate, etc. will be taken into account. Eventually, the sum total of the factors indicated in paragraph 32.1.6 and 32.1.7 would be taken as the "Evaluated Bid Price" of the bidder.