Surendra Jain v. Union of India
Case brief
What is this about?
Petitioner sought a new railway overbridge to replace an unsafe structure built in 1921. Post-traffic suspension, authorities proposed strengthening and widening the existing bridge. Court directed inspection which found land acquisition is essential to increase width; proposed design expansion was infeasible.
What did the court decide?
Nothing survives consideration; writ petition disposed of.