. 2 Preparation of DSR - DSR which is a technical document shall be prepared in line with the MoEF&CC Notification, dated 15/01/20216. dated 25-July-2018 and ESMMG 2020. The contents of DRAFT DSR shall be as under:- |
• The sub-divisional committee (SDC) will prepare the draft DSR. If required the SDC may take help/assistance of QCI/NABET |
Contents of Report:- 1. Introduction |
Consultants, DGM Approved Exploration |
2. Overview of Mining Activity in the District (brief history of old working, pre-existing and proposed mining activities). 3. List of Mining Leases in the District with location, area and period of validity. 4. Details of Royalty or Revenue received in last three years. |
Agencies as per Government Order ref. no 1659/86-2023 dated 17-May-2023 issued by Secretary Geology & Mining. |
5. Detail of Production of Sand/Morrum/RBM or other minor mineral in last three years. |
• Additionally, the SDC may also take |
6. Process of deposition of sediments in the Rivers of the District (River Geometry). 7. General Profile of the District. 8. Land utilization Pattern in the district: Forest. Agriculture, Horticulture, Mining etc. 9. Physiography of the District. 10. Rainfall: month-wise. |
help/assistance of renowned academic institutions/ Universities having domain expertise in Environment/ Geology and Mining. |
| 11 Geolo and Mineral Wealth |
|
. gy . 12. The report shall also contain:- a) District wise detail of river or stream
|
• It will be the responsibility of |
and other sand source; b) District wise availability of sand or gravel or aggregate resources; c) District wise detail of existing mining leases of sand and aggregates. 13. Drainage system with description of main rivers
|
SDC/hired agency to collect primary and secondary data, DSR drafting with Annexure- 1 to Annexure-VII and conduct presentation before SEAC/SEIAA and |
a) Name of the river. b A did k |
DGM. |
) rea rane (sq. m) c) Percentage area drained in the Dii |
• Whenever a new lease is
|
strct. 14. Salient Features of Important Rivers and Streams:- |
identified for adding in the DSR, the SDC/hired agency will follow the |
a) Name of the river or stream. b) Total length in the district. (in Km.) c) Place of origin.
|
entire procedure every time on the basis of existing DSR. The |
d) Altitude at origin. e) Portion of the river or stream recommended for mineral concession. f) Length of area recommended for mineral concession. (in Kms) |
validity of amended or modified DSR will be upto the validity of the original DSR. |
g) Average width of area recommended for mineral concession
|
• The SDC/hired agency will update the data in |
(in meters) h) Area recommended for mineral |
the revised DSR with
|
concession (in square meter) |
reference to the primary |