Misc Application in disposed of cases No. 23/2025 in Original Application No. 487/2023 of Satishchandra Pati Tripathi vs
Case brief
What is this about?
In MA No.23/2025, the National Green Tribunal disposed of the application after the UPPCB filed a compliance report stating that Environmental Compensation was imposed on two brick kilns but recovery action was pending. The Tribunal directed the Board to report on recovery status within six months.
What did the court decide?
Directed the UPPCB to file a fresh report within six months disclosing the status of EC recovery and the status of the brick kilns on re-inspection.