G.Dhanapandi Subbiah v. the Chairman
Case brief
What is this about?
Madurai Bench, Madras High Court; W.P.(MD) No.14114 of 2018 & W.M.P(MD).No.12787 of 2018; Justice P.T. Asha; decided 25.10.2025. Petitioner G.Dhanapandi Subbiah vs Chairman/Chief Engineer/Superintending Engineer/Executive Engineer/Assistant Divisional Engineer/Assistant Engineer of Tamilnadu Generation and Distribution Corporation (TANGEDCO), Tahsildar Thirupparankundram, and Ravichandran. Transformer erected inside petitioner's plot, Survey No. 53/12 T, Plot B7, Thanakankulam Village, Madurai South Taluk; representation dated 21.06.2018 unanswered; directions for boundary demarcation per patta and sale deed and shifting of transformer to road portion within 3 months; disposed, no costs; Article 226 mandamus; no precedents cited.
What did the court decide?
Writ petition disposed of with directions: the seventh respondent (Tahsildar) to measure and demarcate the petitioner's property as per the patta and sale deed, and the fourth respondent (Executive Engineer) to shift the transformer to the portion of the road if found within the petitioner's boundaries, the exercise to be completed within three months of receipt of the order; no costs; connected miscellaneous petition closed.