E.Ranganayaki v. The Commissioner
Case brief
What is this about?
The Court disposed of a writ petition concerning safety near a school. After finding premature construction of a pedestrian crossing dangerous due to high speeds from a flyover, the Court directed the Greater Chennai Corporation to install a controlled pedestrian crossing with traffic signals as an interim measure while awaiting the construction of a foot over bridge.
What did the court decide?
Directed the Greater Chennai Corporation to provide a Controlled Pedestrian Crossing with a signal at 125 meters from the flyover as an interim measure within four weeks.