that failure to comply with the requirements of Section 15(1) vests in the landlord an 'indefeasible right' to secure an order for the eviction of the tenant under Section 14(1)(a). The Court set aside the judgment of the High Court taking that view and remanded the matters to the Rent Controller observing that there was still an issue to be tried. If that be so, the question at once arises "What is the issue to be tried ?". If the landlord has still to make out a case before the Rent Controller that he was entitled to an order for eviction of the tenant under Section 14(1)(a), surely the tenant has the right to participate in the proceedings and cross-examine the landlord. It must logically follow as a necessary corollary that if the defence is not to be struck out under Section 15(7) it means that the tenant has still the defences open to him under the Act. In the premises, the conclusion is irresistible that he has the right to claim protection under Section 14(2). What is of essence of Section 14(2) and of Section 15(6) is whether there has been a substantial compliance with the order passed under Section 15(1). The words "as required by Section 15(1)" in these provisions must be construed in a reasonable manner. If the Rent Controller has the discretion under Section 15(7) not to strike out the defence of the tenant, he necessarily has the power to extend the time for payment of future rent under Section 15(1) where the failure of the tenant to make such payment or deposit was due to circumstances beyond his control. The previous decision in Hem Chand case interpreting Section 15(7) and Section 14(2) in the context of Section 15(1) of the Delhi Rent Control Act, 1958, although not expressly overruled, cannot stand with the subsequent decision in Shyamcharan case interpreting the analogous provisions of the Madhya Pradesh Accommodation Control Act, 1961 as it is of a larger Bench.”