S.CNc,.3405 00689 under LT-III Category (industriai) for a contra(:ted load of ru fJP. \7tren the 5,h pedtioner-fusisrant Divisional Engineer inspected the service connection of the L', responJent, he noticed that the 1-'. respcndent has exceeded the contracted load from 74 TD to 108.367 I*. Wren once rhe contra(ted load exceeds, the billing shall be automatically under HT Gtegory in the energy billi"g sFtem and the bill shall be raised based on FIT tanff . Since the L" respondent has exceeded the co ntracted load, HT bill was raised from 09 .03.2024 ro 06.04.2024 under HT Category-I. Flence, the L', respondent submitred a representation dated L5.04.2024 seeking to revise the bill wit.r LT tariff rarcs. Thereupon, the petitioner- C-ompany uide lener')-4.04.2024 informed the L', respondent that as the contr:acted load was exceeded, the bi[ cannot be revised. Challenging the said HT Bill as well as the lener, the L', responrlent has filed a complaint before the C-onsumer Grievances Redresssal Forum of TGSPDCL (Grearer Hyderabad Area) :;eeking to set aside the claim of excess amounr of Rs.3,55,165l- pertaining ro the period from 09.03.2024 ro i 06.04.2r)24 and to issue revised bill with LT tariff ntes. The