M/s. Mutyalamma Modern Rice and G.N.Oil Mill, v. The Asst. Divisional Engineer
Case brief
What is this about?
The High Court held that a demand for regularization of additional electricity load is unsustainable if based merely on meter readings without physical verification. The court set aside the notice, remanding the matter for fresh determination after aggregating manufacturer ratings of all apparatus, as required by the Guidelines for Electric Power Supply.
What did the court decide?
The impugned notice is set aside and the matter is remitted for physical verification of apparatus ratings.