purposes. The project proponent did not comply with the condition of establishment of STP imposed in the NOC. Environmental Compensation of Rs. 1,11,06,250/- at the rate of Rs. 6,250 per day for 1771 days for violation from 16.02.2016 to 31.10.2021 was imposed vide letter no. H06155/C-4/NGT-175/EC/2024 dated 24.01.2024 on the Project Proponent. Recovery Certificate has been issued by the State Board vide Letter No. H27808/C-4/NGT-175/RC/Mathura/2025 dated 05.05.2025. 78. Respondent no.7 has challenged imposition of EC on respondent no.7 by UPPCB and submitted that EC has been imposed by UPPCB in a mechanical manner, without having considered the pertinent issue of Sewer Connection approved by the Mathura Vrindavan Authority and without analyzing the fact that if no treatment is taking place at Site as the sewer line is connected to common STP, and no trade or industrial activity is taking place, there is no requirement of installation of STP and consequently no requirement of Consent to Operate at the site. Respondent no. 7-SJPGL has also submitted that respondent no.7SJPGL submitted detailed reply dated 04.11.2023 to the show-cause notice issued by UPPCB but order dated 24.01.2024 imposing EC on respondent no.7 was passed without taking into consideration the same and without waiting for reply of Secretary of MVDA. Respondent no. 7- SJPGL has also mentioned about making of representations dated 07.02.2024 and 10.02.2024. 79. Respondent no. 7 has also challenged imposition of EC on the ground that UPPCB had no power to award EC under the Water (Prevention and Control of Pollution) Act, 1974 and the Air (Prevention and Control of Pollution) Act, 1981 in view of judgement passed by Division Bench of Hon’ble Allahabad High Court in Writ.C No. 8804 of