K.Madeswaran v. The Director
Case brief
What is this about?
Windmill siting clearance challenge, Madurai Bench, Madras High Court, W.P.(MD)No.9142 of 2026, D. Bharatha Chakravarthy J., 09.04.2026. Keywords: micrositing guidelines; MNRE Memorandum dated 22.10.2016; Clause V(iv); HH+1/2RD+5m; 217 metres minimum distance; hub height 140 meters; rotor diameter 72 meters; 112.66 meters; high-voltage / EHV electrical line; 3150 kilowatt wind electric generator; S.F.No.167/1 Thethupatti Village Aravakuruchi Taluk Karur District; adjacent owner S.F.No.69/1; Jindal Green Wind 1 Pvt. Limited; Tamil Nadu Green Energy Co-Operation Limited; location clearance 18.03.2026; Article 226 certiorari; pre-commissioning inspection; relocation of windmill tower; W.M.P.(MD)Nos.7325-7327 of 2026.
What did the court decide?
The writ petition was ordered accordingly with directions, not by quashing the clearance itself: respondents 1 and 2 (including through respondents 3 and 4) to inspect the site within one week, after prior notice to the petitioner and the sixth respondent and in their presence; if a micrositing violation is found, to pass orders directing relocation of the tower; the outcome to be communicated to the petitioner; final order within two weeks of inspection. No costs. Connected Miscellaneous Petitions (W.M.P.(MD)Nos.7325 to 7327 of 2026) closed.