Rs.6,37,16,206/-was submitted to the Chief Engineer KSRRDA on 07.07.2018 incorporating all the additional work required for the satisfactory completion of the road. Due to delay in sanctioning of revised estimate No. (1), a revised estimate (2) incorporating urgent works is passed by the 2nd respondent below 10% excess and 4th respondent executed the supplementary agreement and carried out the work except rise of culvert wing wall at Ch 1920, parapets wearing out of retaining walls, guard stones, road signages etc. A true copy of the Supplementary Agreement No. 3 dated 11.07.2019 to the Original Agreement No. 30/CE KSRRDA/2017-18 dated 25.07.2017 is produced herewith and marked as Annexure R3(h). The Photograph shown as Ext P17 is the portion of road between chainage 2940 to 2955 m. At this portion the road is damaged due to overflow from the existing slab culvert that was blocked by a log piece at the time of flood. Also flood affected between chainage 315 to 330m right side is where earth slip occurred. The Chief Engineer, KSRRDA has inspected the site on 01.06.2021 and consequently a flood estimate incorporating the portions affected by flood. A flood estimate of Rs.40,99,398/- was submitted to KSRRDA. The Flood estimate amount for rectifying the damages is Rs.40.99 lakhs. The flood estimate is submitted to Chief Engineer, LSGD for including it in the Rebuild Kerala initiative. The fund sanction is in the active consideration of the Government. Once the estimate is sanctioned, the damages occurred to the said road can be rectified, the flood estimate will be tendered through separate tender. The 4th respondent contractor is liable to complete the work as per original agreement and also the additional works extended by Annexure R3(h) supplemental agreement. As regards to the flood estimate this respondent will initiate work immediately on sanctioning flood estimate by the government with new tender, before the same the 4th respondent is liable to complete the remaining work mentioned in the original estimate as approved initially and the supplemental agreement. It is respectfully submitted that Kambilane Unnikuzhi Kallar road is constructed strictly in accordance with expert opinion with adequate safety facility for irish drain and retaining wall except certain works which were not completed by the 4th respondent. This respondent had served Annexure R3(d) to R3 (g) notices to the 4th respondent directing him to complete the work by extending his