A bailiff order disposing of an infructuous urgency application and directing service of notices on a stay application in an appeal filed under section 18 of the SARFAESI Act.
What the court decided
A compact analysis
This page shows the compact analysis of this judgement. The full analysis — procedural history, issue-by-issue holdings with ratio and obiter, advocates, and paragraph-level evidence for every claim — is being added to the record in batches and will appear here when this judgement has been through it.
Appeal Dy. No. 1154/2022 Date: 12.01.2023
IDBI Bank Vs. M/s Anurag Engineering Work
Present: Shri Deepak Kapoor, counsel for the appellant,
Heard the learned counsel for the appellant.
The present appeal has been filed under section 18 of the SARFAESI Act against the final order dated 06.12.2022 passed by the DRT, Jabalpur in S.A. No. 109/2022. The report of the Registrar dated 05.01.2023 shows that I.A. No. 717/2022 being urgency application and I.A. No. 718/2022 being stay application have been filed.
Since the matter has been taken up today, therefore the urgency application being I.A. No. 717/2022 has become infructuous and is disposed off as such.
Issue notices to the respondents on the stay application by two modes i.e. Registered Post with A.D. and Speed Post. Steps to be taken by the appellant within a week. Affidavit of service along with tracking report be filed by the next date.
List this case on 18.04.2023 for service.
Justice R. D. Khare Chairperson
Anupam
Parties & counsel
- appellant
IDBI Bank
- respondent
M/s Anurag Engineering Work
Coram
R. D. Khare
Case details
As recorded by the court registry
All orders in this case