S.M.C. - G.E.C.P.L. (J.v.) v. the Commissioner Solapur Municipal Corporation and 2 Ors.
Case brief
What is this about?
Section 34 Arbitration Act challenge dismissed; perversity tests (finding based on no evidence / irrelevant consideration / ignored vital evidence; no fair-minded person standard); possible view of arbitrator respected; appellate re-evaluation barred; admissions in cross-examination constitute best evidence; fifteen heads of delay — bhoomi poojan 97-day condonation, second/third bar chart approvals, PWD/NHAI/Railway permission fees never deposited, STP land unavailable (40% of contract value), faulty line-out drawings, Degaon 75 MLD layout approved after 3 months, 33 KV transformer tenders never floated, electric pole demolition permitted 23.08.2013, basic engineering package 10-month delay, billing breakup, general arrangement drawings, underground sewerage design, KT-weir, RA bill payment delays 78–183 days, MJP/PMC coordination and PHE incompetency; penalty orders Rs.2,500 / Rs.10,000 / Rs.50,000 / Rs.11,44,000 per day; pre-expiry termination 9 December 2013; blacklisting 11 April 2014; Clause-39 prohibition on sub-contracting 'whole' works only; KEC International subcontracting allegation; 18th RA bill certification by MJP-PMC at Rs.19,25,91,000 against claim of Rs.29,65,65,000; VAT/TDS/labour cess deductions; local body tax pre-bid clarification (materials outside city limits); loss of profit versus loss of profitability distinction; percentage-of-unexecuted-work damages without proof of actual loss on wrongful termination; A.T. Brij Paul Singh 15%; Dwaraka Das 10%; Unibros; Bharat Coking Coal; Batliboi; SIPCOT v RPP Infra (Madras HC survey followed); S.K. Maji (Calcutta HC); OPG Power Generation v Enexio (three-judge contours of s.34); Associate Builders; Ssangyong; Dyna Technologies; Supreme Court modification to 50% Bank Guarantee / 50% deposit (SLP (c) No.14697 of 2022); award upheld; both petitions dismissed; Bank Guarantee return/encashment with eight-week stay.