6 The counsel for the appellant would submit that the building in which the appellant is located is declared as a Cess building and MHADA was permitted to carry out repairs to the said building through Mumbai Building Repairs & Reconstruction Board (M.B.R.&R). Pursuant to the same, work order was issued to a private party to carry out the necessary repairs. In the meantime, a speaking order was issued on 15 March 2022 to the owner/occupier of 132, Zakaria Masjid Street, Mumbai. where the Executive Engineer (Designated Officer, Building and Factory Department, B Ward) would clarify, the notice by stating that after going through the work order and repair plan of the Executive Engineer, M.B.R.&R, it may be concluded that construction above 5th floor is unauthorized. It is further clarified that the notice is about the construction above 5th floor and this construction is sought to be removed, within a period of seven days, in absence of which, an action under Section 354 is contemplated.