amount of Rs.23,60,212/ from the account of the committee. Thus it is transpired that the committee has withdrawn the amount of Rs. 5,30,850/, without completing the actual construction works as per the Estimate/Technical sanction and has not submitted the account books and the measurement book for inspection. The Executive Engineer, Water Supply, ZP Aurangabad during the course of inquiry has submitted by the committee President/Secretary/Member has committed misappropriation of amount of Rs.5,30,850/. The President of the Water Supply Committee Gram Panchayat Wadji namely Hakim Bhai Shaikh and the Secretary Shri Jagdish Raut, during the course of inquiry has admitted the fact the entire works of the construction of Water Supply Scheme has not been completed and the pipeline of 60 mtr has not laid down, the air valve has not been installed, the switch room has not been constructed, water level indicator, lightening conductor has not been installed. The committee President/Secretary has submitted that they have produced the measurement book, bank account book of the committee for inspection before the Executive Engineer Water Supply ZP Aurangabad on 9.4.2014.