the availability in respect of Farakka STPS and Kahalgaon STPS, Stage–I were more than 84% and 91% respectively from the period 2005-06 to 2007-08 and the Average availability in respect of Farakka STPS and Kahalgaon STPS, Stage-I taken together was 88% during the said period, which is higher than the NAPAF of 85% specified under Regulation 26(i)(a) of the 2009 Tariff Regulations. Even though theactual availability in respect of Farakka STPS was 84%, the NAPAF of the said generating station was fixed at 85%, considering the fact that Farakka STPS and Kahalgaon STPS, Stage-I generating stations were linked to a common source viz Rajmahal Coal fields, for coal and the requirement of coal could be adjusted in order to achieve 85% NAPAF for both these generating stations. Thus, the details in Table-I amply demonstrate the fact that there has been no shortage of coal in Farakka STPS and Kahalgaon STPS, Stage-I upto the year 2007-08 and both these generating stations were in a position to achieve 85% NAPAF without any difficulty. 12. From the details given in the tabular statement in Table-II under paragraph 7(c) above it is observed that the availability in respect of Farakka STPS and Kahalgaon STPS, Stage–I has gradually decreased since the year 2008-09. The first unit of Kahalgaon STPS, Stage–II was commissioned during August, 2008 and Unit–II was commissioned during December, 2008. It has been submitted by the petitioner that the coal supply to Kahalgaon STPS, Stage–II was linked to MGR system from Chuperbhita, Rajmal expansion and Hurra mines of ECL, but the development of the