The petitioner was successful bidder in the auction conducted to lease out right to quarry sand in Godavari Sand Reach in Bhadrachalam, in Khammam District. By proceedings dt.29.9.2005 the lease was granted from 1.10.2005 to 30.9.2006 as the petitioner quoted a sum of Rs.17,65,000/-. It appears, when there was deposit of sand in Block No.2 in S.No.16 the first respondent auctioned the sand and third respondent herein became highest bidder quoting Rs.46,000/-. He was required to remove the sand within two months. As he could not remove within two months, he approached the first respondent for extension of time by three months. Apprehending that if such extension is granted to third respondent he might encroach upon the river reach leased out to the petitioner, present Writ Petition is filed seeking a direction to respondents 1 and 2 not to grant extension to third