to Rs.2,17,418.14 ps which included an amount of Rs.15,019.15 ps for making a jeepable road. As such after excluding the aforementioned amount, the net expenditure on earth work worked out to Rs.2,02,398.99 ps. It was pleaded that a departmental inquiry was got conducted against Sh.Sat Narain, the then Section Officer/Junior Engineer and Sh. S.C. Jain, Executive Engineer, P.W.D. (B&R) Branch, Ambala Cantt. In pursuance to the inquiry findings three officials namely Sh.S.C. Jain, Sh. Sat Narain and Sh.Anand Parkash Singla, defendant no.1 were held equally responsible for not having performed their duty properly while checking the measurement and supervising the work on the road in question and as such a loss of Rs.1,54,369.57 ps had been caused to the State of Haryana, P.W.D. (B&R) Branch. Such loss so quantified was to be shared equally by the three officials. Sh.Sat Narain, the then Section Officer/Junior Engineer had already deposited the amount of loss attributable to him and proceedings to recover the share of loss from Sh.S.C. Jain, the then Executive Engineer were in progress. It was stated that defendant no.1 had left the service of Haryana Govt., P.W.D. (B&R) Branch on 4.2.1970 and had joined as Sub Divisional Engineer in Marketing Board, Haryana. Repeated requests had been made to defendant no.1 through defendant no.2 i.e. the Marketing Board, Haryana to deposit the amount of loss attributable to him i.e. Rs.51,456.52 ps but he had failed to deposit the same. Against such factual backdrop the suit for recovery of the amount along with the interest @ 18% per annum from the date of filing of the suit till actual realization had been instituted.