M/s R.S. Construction v. The State of Bihar
Case brief
What is this about?
Patna High Court, CWJC No.17011 of 2025, decided 28-01-2026, per Sudhir Singh, J. (bench: Sudhir Singh and Ritesh Kumar, JJ.). Petitioner M/s R.S. Construction challenged the deemed rejection of its technical bid under BMSICL NIT No. 23/2025 (NIT no. BMSICL/Infra/23/2025 dated 02.09.2025) for 100-bed Critical Care Blocks at Sadar Hospital, Buxar (Group 3) and Medical College, Begusarai (Group 6), alleging arbitrary reduction of the SBD Clause 22.4(iii) clarification period from 7 days to 2 days and seeking acceptance of its clarification (File no. BMSIC/75030/11-2025 dated 20.09.2025), treatment as technically qualified, opening of its financial bid, and abeyance of the tender process. Counsel for Respondent Nos. 2-6 (BMSICL) submitted the tender was withdrawn and a fresh tender floated; the Court found the matter infructuous and disposed of the writ application and pending applications. Keywords: BMSICL; NIT No. 23/2025; deemed rejection of technical bid; Clause 22.4(iii) Standard Bidding Document; clarification period; Critical Care Block; Sadar Hospital Buxar; Medical College Begusarai; tender withdrawn; fresh tender; infructuous; writ disposed. No quantum involved; no precedent or statute cited.