M/S Sinki Construction v. Project Manager,Orissa Power Transmission Corp. Ltd.
Case brief
What is this about?
of 1 IN THE HIGH COURT OF ORISSA AT CUTTACK…
This page shows the compact analysis of this judgement. The full analysis — procedural history, issue-by-issue holdings with ratio and obiter, advocates, and paragraph-level evidence for every claim — is being added to the record in batches and will appear here when this judgement has been through it.
IN THE HIGH COURT OF ORISSA AT CUTTACK CONTC No.1171 of 2020
M/s. Sinki Construction
….. Petitioner
Mr. B.K. Barik, Advocate
Vs.
….. Project Manager, Orissa Power Opposite Party Transmission Corporation Ltd., Bhubaneswar
Mr. M.R. Dhal, Advocate
CORAM:
ACTING CHIEF JUSTICE DR. B.R. SARANGI MR. JUSTICE MURAHARI SRI RAMAN
ORDER
09.10.2023
Order No. This matter is taken up through hybrid mode.
02.
2. It is stated that the order of this Court has been complied
with.
3. Accordingly, the contempt proceeding is hereby dropped.
(DR. B.R. SARANGI)
ACTING CHIEF JUSTICE
Laxmikant (M.S. RAMAN)
JUDGE
Signature Not Verified
Digitally Signed Signed by: LAXMIKANT MOHAPATRA Designation: Junior Stenographer Reason: Authentication Location: HIGH COURT OF ORISSA, C UTT ACK Date: 09-Oct-2023 17:52:44
Page 1 of 1
M/s. Sinki Construction
Project Manager, Orissa Power Opposite Party Transmission Corporation Ltd.
B.R. Sarangi
M.S. Raman
As recorded by the court registry
Judgements on the same questions, provisions and authorities, from every court