In the matter of Rana Heavy Engineering Pvt. Ltd. [Ia No. 668-2023 in Cp (Ib) No.50-ALD-2022]
Case brief
What is this about?
The Tribunal observed that the proposed resolution plan value was lower than the liquidation value. Since the Committee of Creditors consisted solely of the Successful Resolution Applicant, the Tribunal directed the applicant to match the plan value with the liquidation value or provide reasons if non-viable.
What did the court decide?
Direction to the Successful Resolution Applicant to consider matching the resolution plan value with the liquidation value of Rs. 7.69 cr or bring reasons on record if not viable.