In the matter of Ebullient Cables Private Limited [Cp (Ib) No.03-ALD-2020]
Case brief
What is this about?
The Tribunal admitted an application under Section 9 of the IBC filed by M/s. ETA Engineering against M/s. Ebullient Cables. The debt was operational and exceeded the threshold. No pre-existing dispute was shown by the corporate debtor. An Interim Resolution Professional was appointed, and a moratorium was declared.
What did the court decide?
Application admitted under Section 9(5)(i); Moratorium declared under Section 14; IRP appointed.