In the matter of Safeco Hygiene Films Pvt. Ltd. a No. 1057-NCLT-AHM-2023 in Cp(Ib) No. 96-NCLT-AHM-2021]
Case brief
What is this about?
The Tribunal allowed the withdrawal of an application under Section 60(5) of the IBC to revoke an approved resolution plan. While disposing off the case as withdrawn, the Tribunal imposed costs of Rs. 1 Lakh on the applicant for filing and subsequently withdrawing the application irresponsibly within 50 days of the plan approval. The costs were directed to be deposited in the PM Narl Fund.
What did the court decide?
Application disposed of as withdrawn; Applicant directed to deposit Rs. 1 Lakh in PM Narl Fund within 10 days.