In the matter of Sadbhav Infrastructure Project Limited [Cp (Ib) No.342-AHM-2022]
Case brief
What is this about?
The Tribunal examined a Section 9 IBC petition filed by an operational creditor for initiating CIRP due to a default of over Rs. 1.35 crore. The Court applied Section 10A, which bars defaults occurring between March 25, 2020 and March 24, 2021. Excluding these amounts caused the claim to drop below the mandatory one-crore threshold, leading to dismissal.
What did the court decide?
The instant petition filed under Section 9 of the IBC for initiation of CIRP was rejected as it was found to be not maintainable.