In the matter of Lorange Design and Retail Pirivate Limited [Ia 2836-2023 in C.P. (IB)-4448(MB)2018]
Case brief
What is this about?
The Tribunal allowed an operational creditor's application to withdraw the Corporate Insolvency Resolution Process initiated against Lorange Design & Retail Pvt. Ltd. after finding the debtor had no assets or going-concern value. The court directed the IRP to refund unspent costs to the creditor. The debtor was released from the moratorium.
What did the court decide?
Withdrawal of the CIRP initiated under the Insolvency and Bankruptcy Code, 2016, and release of the corporate debtor from the moratorium. Director shall refund unutilized interim costs to the operatio