In the matter of Greatweld Engineering Pvt. Ltd. [I.a. 2016 of 2022 in Cp No. 2797 of 2019]
Case brief
What is this about?
NCLT Mumbai Bench rejected an interim application seeking admission of a belated operational creditor claim. The court upheld the IRP's rejection due to excessive delay (379 days) post-CIRP initiation and the lack of proper authorization for the parent company to file for the subsidiary.
What did the court decide?
The application for reconsideration and admission of the claim was rejected and the matter was disposed of.