In the matter of Raj Transmission Engineering Limited Cp (Ib) No.59-Chd-CHD-2021
Case brief
What is this about?
The Tribunal admitted a Section 7 petition filed by Pegasus Assets Reconstruction Pvt. Ltd. against M/s Raj Transmission Engineering Limited. The court held the petition filed within limitation due to a fresh cause of action from a DRT recovery certificate, found default established, appointed an IRP, and declared the moratorium.
What did the court decide?
Admitted the Section 7 petition, appointed M/s Vivek Kumar Arora as Interim Resolution Professional, declared moratorium under Section 14, and issued directions for asset control and claims process.