In the matter of Pragati Engineering & Rail Projects Private Limited Ia No.243 of 2022 in Cp (Ib) No.41-9-AMR-2020
Case brief
What is this about?
The Interim Resolution Professional sought withdrawal of the insolvency petition before the Committee of Creditors was constituted. The Tribunal allowed the application, noting that Regulation 30A permits such withdrawal pre-CoC and conditions like fee payment were met.
What did the court decide?
Permission granted to withdraw the insolvency petition under Section 12A read with Regulation 30A; main Corporate Insolvency Resolution Process petition dismissed as withdrawn.