In the matter of Petron Engineering Construction Limited Ia 1085 and Ia 1696 of 2020 in Cp (Ib) 1374-MB-C-II-2017
Case brief
What is this about?
The NCLT Mumbai Bench held that inquiries under Section 7A of the EPF Act initiated and orders passed after the imposition of a moratorium under Section 14 of the I&B Code, and during liquidation under Section 33(5), violated the statutory embargo. The court set aside the determination orders and recovery notices despite admitting that a portion of PF dues was verified and payable.
What did the court decide?
The determination orders dated 06.03.2020, 04.03.2020 and the recovery notice dated 25.06.2020 were set aside.