In the matter of Novus green Energy Systems Ltd. IA(IBC)555-2022 in Cp(Ib) 419-9-HBD-2020
Case brief
What is this about?
The Tribunal allowed an application filed by the Interim Resolution Professional to withdraw the CIRP against the Novus Green Energy Systems Ltd, following an amicable settlement between parties.
What did the court decide?
Leave granted to withdraw CIRP; CP(IB) No. 419/9/HBD/2020 disposed of as withdrawn; Corporate Debtor permitted to conduct business.