“5. I say that, subsequently Revised Building Permission was granted for a built-up area of 184,832.99 Sq.Mtrs which includes (Gross Built-Up Area of 309,457.29 Sq.Mtrs) vide letter bearing Sr. No. MNP/NR/ 1561/2023-24 dated 14/08/2023, for building types A,B,C,D,E,F,G,H,J,K,L and Club House, within the limits specified in Letter bearing Sr. No. MNP/NR/436/2023-24 dated 10/5/2023. As per the sanctioned Coastal Zone Management Plan 2011, Land bearing S. No. 68(235) and 69(256) is affected by CRZ-II but as per the Costal Regulation Zone Map and Report (As per Approved CRZ — 2019 Notification) prepared by Institute of Remote Sensing Anna University Chennai, the said land is not affected by CRZ-II. Considering the same thereafter, revised building permission vide Letter No. MBMC/RB/ 2024/APL/00014 dated 19/7/2024 was granted for building types A,B,C,D,E,F,G,H,J,K,L and the clubhouse within a limit of 184,909.64 Sq.Mtrs (Gross Built-Up area of 308,402.40 Sq.Mtrs) As per the letter submitted by licensed Engineer, M/s. Tejas Consultant vide letter no. E-43 18417 on 21st Feb, 2025 , status of the construction of the proposed buildings in building permission vide letter bearing Sr. No. MNP/NR/ 1561/2023-24 dated 14/08/2023 and building permission vide Letter No. MBMC/RB/2024/APL/ 00014 dated 19/7/2024 is as follows: