on the banks of the pond. 6. Presently there is no pond, pond During such construction, like structure present in said 1000 number of fully grown land. trees was cutter down and 7. Presently there no encroachment filled the pond with debris for has been found in the said land. building construction, which were planted by the villagers on As per District Administration office this land for fresh air and good Tahsil Maihar inspection report environment. Also, this pond followings are :- was boon to the residents of all nearby villages, as they are • Report of said land as per already surrounded by highly Patwari Halka no.47 Barhion polluting area surrounded by dated 09.01.2024. (Annexure - various hazardous chemicals of 13) industries. This piece of land • which was made as pond by "Najari Naksha" is prepared by Patwari Halka no.47 Barhi the villagers was the only green dated 08.01.2024. (Annexure - peice of land left with the 14) villagers, which was a big sigh of relief for them and also this • "Sthal Panchnama" on dated pond helped not only in 04.01.2024. (Annexure -15) combating the pollution of that area but also lot of folks of • Statement by Dr. Arun Kumar cattle and birds were Gautam , Principal Govt. Vivekanand dependent on the said pond for College, Maihar on dated drinking water and lived 06.01.2024. (Annexure -16) around • Statement by Mr. LaIan Shahu on dated 06.01.2024. (Annexure -17) • Statement by Mr. Rajaram Tiwari on dated 06.01.2024. (Annexure - 18)