The industry has installed ETP consisting of oil and grease traps, equalization tank-1, equalization tank-2, pre-primary clarifier, preaeration tank, aeration tank-1, clarifier-1, aeration tank-2, clarifier-2, post equalization tank-1, post equalization tank-2, MGF feed Lank, treated water tank and R.O system for treatment of LTDS effluent generated from its process and two no. MEEs of capacity 350 KLD and 90 KLD for treatment HTDS effluent. The industry is generating domestic effluent from its premises and same is being treated in ETP installed by industry. The industry has developed plantation area within its premises in an area of about 4 acres to utilize the partial quantity of R.O permeate onto land for plantation as per their requirement. The industry has installed two no. tubewells as source of water supply same are equipped with water meters to adjudge the quantity of groundwater abstraction used for industrial as well as domestic purposes. The industry has already obtained permission from Central Ground Water Authority (CGWA) vide dated 1/11/2011 for the abstraction of groundwater @ 1015 KLD. Copy of the said permission is annexed as Annexure-A. However, the industry has not yet obtained permission from Punjab Water Regulation & Development Authority (PWRDA) for the abstraction of groundwater . In this regard, the representative of the industry informed that they have already applied to PWIRDA for abstraction of ground water and yet to obtain final permission from the said authority.