5. Neither the said notice, nor the inspection report relied upon therein were challenged by the applicant. However, Central Zonal Bench of this Tribunal, considered the affidavit of the Mining Officer to the effect that the applicant was committing breach of EC conditions. The Tribunal directed the MP PCB to issue notice for cancellation of the EC and also to impose penalty. Accordingly, MP PCB constituted a committee headed by Chairman of SEAC, requiring the committee to make an assessment for the penalty. The committee held a meeting on 05.12.2017 and decided to seek information regarding loss of royalty. Thereafter, the matter was again taken up on 06.12.2017 and it was held that for violation of four conditions, penalty has to be imposed @ Rs. 200 per cubic meter with reference to the quantity of sand excavated. It was noted that as per Government rate, the market price of the sand from 01.02.2017 to 27.02.2017 was Rs. 8,547.94 per cubic meter.