3. At the time of inspection, the temperature of the primary chamber of the incinerator was displayed at 830°C and of the secondary chamber at 1028°C on the panel board of the online emission monitoring system installed in the unit. At the time of joint inspection Stack Emission monitoring was conducted. As per stack monitoring report dated 24-01-2023 concentration SPM found 43.63 mg/NM3 which is within the standards specified by the Board. Stack Monitoring Report is attached. (Annexure-8) and the sample of treated effluent was collected and analyzed by the board. As per analysis report dated 27-01-2023 BOD-16.0 mg/L, COD-64.0 mg/L, TSS-68.0 mg/L, TDS-1420.0 mg/L, and pH-7.3 found as per norms prescribed by the Board (Annexure-9). The unit has obtained CTO Water vide online reference no.139387/UPPCB/Bareilly(UPPCBRO)/CTO/Water/Bareilly/ 2021 dated 22.12.2021, valid up to 31.12.2025., CTO Air vide online reference no.139385/UPPCB/Bareilly (UPPCBRO)/CTO/ Air/Bareilly/2021 dated 22.12.2021, valid up to 31.12.2025, Hazardous Waste Authorization from Board vide online reference no. 13598/UPPCB/Bareilly (UPPCBRO) HWM/Bareilly/2021 dated 16.05.2021, valid up to 15.05.2026, Bio-Medical Waste Authorization from Board, vide online Reg. No. 13770167 dated 28.12.2021, valid up to 31.12.2025 and permission for extraction of Ground water from District Ground Water Authority vide reg. No. 202108000848 dated 27.08.2021 (Annexure-10). Points wise status report of CBWTF and compliance report of BMW authorization and Consent Water/Air submitted by the CBWTF on dated 02-01-2023 to the Board are annexed as (Annexure-11).