16. In view of earlier orders quoted above and discussion in paras 10 to 12, we are of the view that steps need to be forthwith taken to stop operation of brick kilns already found to be operating in violation of environmental norms till compliance by the State PCB in exercise of its statutory power, following due process of law, till compliance. This will include brick kilns not following consent conditions, operating in excess of carrying capacity, CPCB guidelines and orders of this Tribunal, and those violating siting guidelines. Necessary action be ensured within two months. At the same time, there is need for further study of carrying capacity, applying correct data and norms. Air quality monitoring equipments be installed in the concerned area and if online monitoring stations cannot be set up, easily available equipments be used to continuously monitor air quality. Stringent monitoring mechanism be put in place. Process of mechanically giving consents be reviewed by the State PCB in view of binding ‘precautionary’ principle. Public health needs to be given due preference to the need for establishment of brick kilns. Violators be strictly proceeded against by way of prosecution, recovery of compensation and preventing pollution. While determining carrying capacity, other sources contributing pollution loads may be factored in while considering concentrations of PM10 in microgram per cubic metre in addition to loads given in kgs. Further, mixing heights data may be referred from the nearest location of IMD station. It is also necessary to clarify reasons of high CEPI score (91.1) particularly for Air and remedial action plan.