The total quantity of waste generated in Kollam Corporation is 112.45TPD. Of this 34 TPD is processed at source with the facilities provided by Kollam Corporation (Subsidized) as well as procured by Individuals (data from field survey conducted by HKS and agency deputed by KMC for Property mapping); about 6.9 TPD is processed at community level(decentralized facility) ; this facility is utilized by households (especially in slum areas)who are not having enough space for installation of source level treatment facilities. 25 TPD of chicken waste and hotel waste were collected by informal waste collectors. Hence, total 65.9TPD of biodegradable waste is treated out of 78.71TPD of biodegradable waste. A total of 54674 households out of 88332 households were benefitted with the completion of current financial year projects i.e., Kollam Corporation has allocated fund of Rs.4,95,00,000/for 27500 No. of bio composter (6954 supplied) in household level , biogas plants(2220 nos.)Rs.2,31,00,000/-; Ring compost (3018 no‟s- BPL families) Rs.75,45,000/- and 5500 compost pit(AUEGS fund). These projects are being in implementation stage; with the completion of above said projects within 31st March, 2021. The gap generated will be filled by implementing new waste management projects in the coming financial year (2020-2021). Also an amount of Rs.8,84,46,250/- has been allotted to Kollam Corporation for waste management projects from Swatch Bharat Mission (Urban) . In this Aerobic composting units (10No‟s), Material Collection Facilities (250 no‟s), Resource recovery Facility of 5000 Sqft (2 No‟s),90% of work allocated under this project is completed. With the advent of integrated solid waste management – Waste to Energy plant, Kollam Corporation is aiming to achieve the 100% management of Municipal Solid Waste. For this, Government of Kerala has selected Kureepuzha in Kollam Corporation to setup a Waste to Energy plant of 200Tpd with a Bio-Methanisation plant, Refuse Derived Fuel and a Landfill. For that 7.05 acres of land in Kureepuzha were leased to KSIDC (nodal agency) and Kollam Corporation has signed the concession agreement for the same. Historically, the Kureepuzha dump site was once a night soil depot since the early 1940‟s, the land was having less value over the period. Nearly 3 acres of land used for night soil depot was then converted on 2nd of October 1982 by the then Kollam municipality for dumping of municipal solid waste. Due to space constraints, Kollam Municipal Corporation has acquired an addition of 14.00 acres of land for safe management of municipal solid waste. Municipal solid waste segregation and Windrow Composting plant (with trommel of different sieve sizes, collection and bagging unit, rejection collection units etc..) was being constructed along with office building , canteen building, weigh bridge system, compound and fencing. The project was established with the consent of Pollution Control Board and was given consent to operate the said plant and scientifically made landfill. The proposed plant and other projects were tendered for an amount of Rs.10 Cores; the project was stalled due to public protest and court order and had to be closed early after spending an amount of Rs.6.80 Cores. The proposed project was intended to scientifically manage the Municipal solid waste that is being generated within the area of Kollam Municipal Corporation; but due to the protest from the public the project was stalled and the plant and machineries are kept idle from the early 2012. Further dumping of waste too is stalled from 2012.