7. That at the time of inspection, a sample of effluent was collected from road side drain along with the boundary of the park. The sample was analyzed in the laboratory of Respondent No.3 vide the Analysis Report dated 06.07.2020 (The Analysis Report dated 06.07.2020 is enclosed as Annexure-6). The road side drain from M/s Gulshan Ikebana, GH-03A, Sector-143, Noida is constructed only up to 500 mt. in length. After that the road side drain is not constructed due to which the domestic effluent and overflow of sewer line spreads in the service road infront of M/s Gulshan Ikebana, GH-03A, Sector-143, Noida (Photograph enclosed as Annexure-7). The construction of road side drain currently undergoing (Photograph enclosed as Annexure-8).