suit, the 5th defendant dug a bore well in his land and installed a compressor. Since the existing switch for the electric motor could not be used for the compressor also, the Electricity Board installed a changeover switch. After installation of the compressor, the 5th defendant was able to draw more water, the common well began to dry up, and the plaintiffs were unable to irrigate their land properly. Therefore, in the last week of October 2006, the plaintiffs also dug a bore well in their land and installed a compressor. When they attempted to use the changeover switch, the 5th defendant obstructed them. Thereafter, the plaintiffs requested the Electricity Board to install another changeover switch, but the Board refused on the ground that there was no provision to install more than one changeover switch for one service connection. The Board also stated that the service connection stood only in the name of the 5th defendant and advised the plaintiffs to apply for inclusion of their names. The plaintiffs accordingly applied on 07.02.2007, and by letter dated 26.02.2007, they were directed to obtain the consent of the 5th defendant. Since the 5th defendant refused consent, the suit came to be filed.