eastern side of the old survey number, Monday MarketCheramangalam Road is running. In 1966, he sold 3-1/2 cents in old survey No.1949 to one Kasi Nadar. At that time, he left a pathway on the southern side measuring about 130 links length and 6 links breath to ingress and egress to the plaintiffs 'B' schedule property from Monday Market road. This pathway is mentioned as 'A' schedule in the plaint. From 1940 onwards, 'A' schedule property was used as a pathway. No other alternative pathway is available to him. He got right over 'A' schedule property, not only on the basis of the right, but also on the basis of prescription and necessity. The defendants have no right over the 'A' schedule property. On 09/02/1999, the defendants closed the entrance by using the wooden rafters, obstructing the ingress and egress. Again on 30/04/1999, the defendants constructed a latrine. From 21/06/1999, they are trying to close the pathway and put up a compound wall. So the suit is filed declaring that the 'A' schedule property is the pathway of the plaintiffs and for permanent injunction; mandatory injunction to remove the superstructure and construction in the 'A' schedule property.