6.The petitioner further states that after the above interim order was passed by this Court, the third respondent, instead of approaching this Court and getting the interim order vacated, in order to make it appear as though that the water blockage problem can be solved only by laying a new canal through the lands purchased by the petitioners under political pressure started sending messages to him and other residents of Iyyappa Nagar, Korattur, Ambattur Municipality stating that the new canal for drainage water and rain water has to be laid through their lands. Immediately on 25.11.2007, on behalf of Iyyappanagar Residents Welfare Association, a general body meeting was held in which a resolution was passed incorporating the true state of affairs, copy of which also was sent to the first respondent. He states that in the said resolution, the Association has clearly pointed out that the drainage water from Ambattur Estate, Attipet, Korattur Housing Board, Korattur Milk Society and Lucas TVS Company has been flowing through from time immemorial adjacent to the railway path proceeding to Villivakkam from Korattur along 100 feet road through Wheels India Limited and Lucas TVS Company and reaching Nalla Kalvai near Anna Nagar West Bus Depot. However, recently, i.e. a few weeks back, Wheels India Limited have blocked the free flow of the water by laying a new entrance on their eastern side by constructing a bridge for passage of heavy vehicles and thereby diverted the water through 100 feet road because of which the drainage water reached Iyyappanagar, SRP Nagar area. He states that “Dinamalar”, Tamil Newspaper in their Chennai Edition dated 13.12.2007 and “The Hindu” have reported with a photograph about the stagnation of drainage water around 4th ward of Ambattur.