Skip to content
regulation2016CENTRAL

8.10 Authorizing entities to lay, build, operate or expand natural gas pipelines, Amendment Regulation, 2016

Text

Uskel Go Slo Uelo-33004/99 REGD. NO. D. L.-33004/99 ANd a Ista o ort Che Gazette of India EXTRAORDINARY PART I1—Section 4 Wilt & Wentfota PUBLISHED BY AUTHORITY a. 116] ae faceit, aera, Aref 30, 2016/27 10, 1938 No. 116] NEW DELHI, WEDNESDAY, MARCH 30, 2016/ CHAITRA 10, 1938 aferearar aT 19) AY Set 61 SIT Wad MAT HT ANT Hed SU, Yatteras sie wraps te fata ate Pratehad Tatas Fara e, AAA: — 1. afere efter ate area (1) at feat ar elferaa siz wrepicte tte fatdarre ate (oredr oredetrest at feared, FATT, Tarts ay faeare Het & fore Hafsat HT afepa HAT) Attest FafAaa, 2016 Het STAT (2) Yacardt asa A Sah Were FT AS F Tact Sh 2. telterra aie wrpicte tte fata ate (avait tre areqeredt at fee, rar, vareta ar faeare (7) fatter 13 4, - (i) sa-fetaaa (1) & feru, fraterhed sideatte enn, ara:- “(1) sifeepa Hot Artsy + ATS ATATT FE IT VAT, PU TE ay, Aer te Hal, ATA HT SAT WAST ATA AT HL STS HUTT”: (ii) sa-fateaa (4) & are, Frafefad s-fataae Sist are, ATAa:- “(5) StS HT Ars / ATH Wedd Hea few ated Hot WH alert AT Gattha Hall se Teh} Ga ale Al Stl Tatts alert H ale Tecra SI Ve 7 HI feaa H Alas wea Hot are are Hl Afard fear ATT”; “(9) aterept bot Hatta Wa Ht, Para / Als Adal S. We veda wed a fare Rate 10 wasttive, S.1-at -vasittivd ax arte Rate & fore S-2 washhtiues ISAT h SATA AT HT Tedd Pel Tem”: (=F) aaa =. fru, Praterhad widest fear are ATA: a: AtHst AT Travel Rate at weqhd wilepa HAT aret Ber Aha eat we wreath F At arUstt:- (i) 9 arses ae Fear rie Pear & fore req =, -10-vastitive : atte ares @ carpet Hy arte eare aAt wedhd wired IAT are Aer Ars sate Te wreath AH FY aU: (i) AFT SIT AG At Te Weald ret We ArlerH are & fers wey S. -2-Versittiteet (i) aaterar at aafterfear afea Hot are FY we areata ofa sas Stumax F Pateed, attr us facta wea; site a: wate at attterer ate arer foraret sree ae FY oreshh site Hat Tar stax, ate HE ST, FT Goa Tea SATA Sd HIT Hl Ast AT) aera a atax ase Te Te Wiaeaaal HT TAT Hee F fates Hh ATA A AVA AGA Sosa HET HATA A HoT HT Mossel (GrHtdH Tea Geseed H fea, PAM, Tarra aT faeaTe HAA H fre Haft Ar wrfetpa Hear) fata, 2010, H fataaa 16 HF ded Haat fafates TROT Tat STI S: wodt sata fattaat fF ae wet aa ate aT apart =tt | AAHIK ATS Hh TAT AAA Fler | ate We: 2. TRAST FT AT 3. varer ferarel eare 4.40 5. arpiden ret 6.-are- | 7.faaret 8.aaat (TEM A) Lar I—ars 4] YR AT USTIA : STATA 3 ea Raa meg * areca aet aed tat aaa -4 Oar, Herat cthacs Us Gait cfhace at 10. eee 11. qeaadt 12. qyaiit area ) aftaear aftarca Travel & att F pet 13. wrpfes te ar aitaa ste deg (wadity oft waefiva) (Tat & Hates Grease & few aN Tel) Het aed 17 .fesrest atta (Wao) Algal SAAT 18. Hea lS Asay Aas (HIT arra F fora) Rare wedtd & fore Aeca get Aras: He| (3) Preah SIRT ated Hel Wah AT Sy CH H Ahh Ser Sealaied F fatdad Alex Aled Reale Hl chs 10 feat & atax agers Ft ort areal 1at- vasittive 1.eodt at ATT 2.0 AT ATT Ma (%) fer Rearé aa ars are CIT A yeda Pau ae ae aH aera fAfee a et wethrTat Trae Loita Frat a (aut) | (evemendtéay | see 7. Soitta arta het wt (atiteeqarett) aftada wrt Searac yy ferra/eara aro Pet Utes 8a AT wt a Ya ATA arta saathrard - fastett at Sat aaa 15.2601 ferfa: (a) Feardt zeor aT. Tareas SIT SST TAT stat THAT Lar I—ars 4] YR AT USTIA : STATA 5 AT ad a pet Ca AT (%) Sart Sart eet fetta at THray 10. era fact sacs 11. Ha AT BAT SATS FX (%) 17. Rare wedi & fee Hace ger antasta: (1) That ares A ats eT SII IK; HIAT ‘0’ Sars Hel (2) FrArel warts & 6O feat At sate A Rare vera amet (3) eam GT alee Festa AT Sy tH h ih Set seated @ fatdad Alex ted ate Ar chs Ott HIT at Rate arate Sq feu we Peat h aan Rare altered TAT Hes at aba S 10 feat & stax TATA LAT HL TET Hel (5) HIST |frferd He fH ga ae at are frareat H ferw wea arHst At Her aes AMT Te ATTA AT Taelteht HITT Ht Aates A YT: AAMT HAT TEI 2. Wet ae eat ATA areas (TAHT AST) 5. are & fer fear 6. ay wat) qat sees fama [Ree | rer ct | agg cele R A U T A E ay a) 10.aaeat art 11. tat 12. Teo HS ATH (HIAT STRAT F fore) STAT % 13.1)fehet ators A Are & fru ars Yea SA I; HIAT ‘O’ Fare He (2) Rare ava Are FT 20 ate aH Tedd At aT Ahl (3) ate At che wit eearerted a fatead Alex ated HoT Ft Rare aaetts eg feu ww Treat h arqare Pare StaerSt TAT Hee AT Abe aS 7 feat H tax aaettsS FT oat AST 14, Ale: HIAT eared = Th attra Rares Woret Hala Hed AAT Braga St Meal & fh Hlaea/ Theat STAT Fest, Ahrag are fecoft : yea fattae arate. 340(a) feats 06-05-2008 %& areqe 4 afearra Eu Sf se aaa. 802(4) feats 19/11/2008, at-ar.fA. 769(7) feate 20-10-2009, ara fr. 38(&) Lar I—ars 4] YR AT USTIA : STATA 7 PETROLEUM AND NATURAL GAS REGULATORY BOARD NOTIFICATION New Delhi, the 29"" March, 2016 F. No. VKS/DB/03/NGPL.—In exercise of the powers conferred by section 61 of the Petroleum and Natural Gas Regulatory Board Act, 2006 (19 of 2006), the Petroleum and Natural Gas Regulatory Board hereby makes the following regulations, namely:— 1. Short title and commencement: (1) These regulations may be called the Petroleum and Natural Gas Regulatory Board (Authorizing Entities to Lay, Build, Operate or Expand Natural Gas Pipelines) Amendment Regulations, 2016. (2) They shall come into force on the date of their publication in the Official Gazette. In the Petroleum and Natural Gas Regulatory Board (Authorizing Entities to Lay, Build, Operate or Expand Natural Gas Pipelines) Regulations, 2008,- (a) in regulation 13, - (i) for sub-regulation (1), the following shall be substituted, namely:— “(1) a authorized entity shall provide, on a monthly and quarterly basis, a progress report detailing the clearances obtained, targets achieved, expenditure incurred, works-in-progress and other relevant information in the forms at Schedule E as per formats E-1A-NGPL, E-1B-NGPL for quarterly reports and E-2-NGPL for monthly report.”; (ii) after sub-regulation (4), the following sub-regulation shall be added, namely:— “(5) a authorized entity shall designate an official of the entity for submitting data /information to the Board and intimate the same to the Board. Any change in the designated official shall be communicated to the Board by the authorized entity within 7 working days.”; (b) in regulation 14, after sub-regulation (8), the following sub-regulation shall be added, namely:— “(9) a authorized entity shall continue to submit post commissioning information / data in the forms at Schedule E as per formats E-1A-NGPL, E-1B-NGPL for quarterly reports and E-2-NGPL for monthly report’; (c) for Schedule E, the following shall be substituted, namely:- “Schedule E [see regulation 13 (1) and regulation 14 (9)] A: Quarterly submission of data by authorized entity in the following formats appended here below:- (i) Format E-1A-NGPL for Quarterly Progress Report on CGD: Physical Parameters (ii) Format E-1B-NGPL for Quarterly Progress Report on CGD: Financial Parameters B: Monthly submission of data by authorized entity in the following format appended here below:- (i) Format E-2-NGPL for Monthly Report on Supply of Natural Gas by Sector C: The data and information required to be submitted by the entity in the above formats shall be analyzed by the Board by comparing the — (i) actual progress made by the entity including commissioning of the project versus the physical and financial targets, identified in its DFR; and (ii) actual volume of natural gas transported in the natural gas pipeline versus the volume committed in the bid. D. Monitoring of the progress shall be taken up by the Board on a quarterly basis and the notice of deviations and shortfalls, if any, shall be sent to the entity on an annual basis for a prompt resolution. In case of any delay in meeting the yearly commitments within the notice period or in case of repeated violations, the entity may face the consequences specified under regulation 16 of the Petroleum and Natural Gas Regulatory Board (Authorizing Entities to Lay, Build, Operate or Expand City or Local Natural Gas Pipelines) Regulations, 2008. E: Entity shall comply with the relevant regulations for affiliate code of conduct. Note: Board reserves the right to seek any information or data from the entity, as it may deem to be fit, to satisfy itself to the compliance by the entity. Appended Formats: Schedule-E / Format: E-1 A-NGPL Quarterly Progress Report on Natural Gas Pipelines: Physical Parameters 1. Name of Entity 2. Project Name 3. Report for the Quarter ending | 4. Year 5. Natural Gas Pipeline Length 6. Diameter in 7. For Quarter 8. Cumulative (since inception) (Kilometers) Inches Target® Actual Target Actual 9. No. of Compressors, intermediate terminals & deliver terminals 10. Compressors Intermediate Terminals 12. Delivery Terminals Till last quarter Added during quarter Total at the end of quarter 13. Average Heat Value of Natural Gas (MMBTU per SCM) 14. Project completion status - 15. For Quarter 16. Cumulative Actual versus approved target (%) Target%* Actual % Target % Actual % (Not Applicable for already commissioned pipelines) Main line Spur line Existing capacity Added during the quarter Total at the end of quarter 18. Any other information (Please write in the box) * Target figures may be given wherever applicable. Quarterly target may be taken as 1/4th of annual target. 19. Important guidelines for submitting the report: 1) In case data is nil for any of the columns; please enter zero '0' (2) Report must be submitted within 30 days from the close of Quarter. (3) A scanned copy of the report stamped & signed by a person of General Manager or above rank, duly authorized by Director of the company, should be uploaded within 10 days from date of submitting the report online as per instructions given for uploading the report. 14. Note: Please note that due to technical reasons, the information sought in columns /rows may have to be rearranged as required while implementing the online reporting system. Lar I—ars 4] YR AT USTIA : STATA Schedule-E / Format: E-1B-NGPL Quarterly Progress Report on Natural Gas Pipelines: Financial Parameters 1. Name of Entity 2. Project Name Name Share (%) . . Name Share (%) 3. Ownership Details Name Share (%) Name Share (%) 4. Report for the Quarter ending 5. Year All figures to be submitted in Lacs Rupees unless specified otherwise Capital Investments 6. Fixed Assets 12. Revenue Earned Opening balance 13. Natural Gas Pipeline Tariff Charged Direct additions Zone Gas Transported Tariff Total Prowress from Capital Work-in- (MMBTU) (Rs./MMBTU) | Tariff Deletions Zone- | 7. Capital Work-in-Progress (CWIP) Zone-3 Additions Zone-5 Transfer to fixed assets Other income Deletions / Transfers Total Revenue Closing balance 14. Profit / Loss 8. Operating Expenses Profit before tax Cost of goods sold Tax Utilities - Power and Fuel Profit after tax Salaries 15. Loans Status: (a) Term Loans Repair and maintenance Opening balance Gen. administrative expenses Added Insurance Repaid Others Closing balance Total Operating Expenses Average Interest Rate (%) 9. Financial Expenses (b) Working Capital Loans Interest on Working capital Opening balance Interest on term loans Added Total Financial Expenses Repaid 10. Depreciation Nett change 11. Total Expenses Average Interest Rate (%) 16. Any other information (Please write in the box ) 17. Important guidelines for submitting the report: 1) In case data is nil for any of the columns; please enter zero '0' (2) Report must be submitted with in 60 days from the close of Quarter. (3) A scanned copy of the report stamped & signed by a person of General Manager or above rank, duly authorized by Director of the company, should be uploaded within 10 days from date of submitting the report online as per instructions given for uploading the report. (4) Annual report for the year-end (4th Quarter) should be submitted duly certified by a Chartered Accountant (CA) (5) Please ensure that sum total of figures submitted for four quarters of the year is equal to the company's audited annual data. 18. Note: Please note that due to technical reasons, the information sought in columns / rows may have to be rearranged as required while implementing the online reporting system. Monthly Report on Supply of Natural Gas by Sector 1. Name of Entity 2. Name of Pipeline 3. Length of Pipeline 4. Design Capacity 5. Report for the month of 6. Year 7. Months 8. Total Natural Gas Supplied 9. Sector-wise Break up of Natural Gas Supplied (MMSCMD) Power Fertilizer City Gas m Refineries Sponge Iron & Steel Others / Internal Consumption April May June July August September October November December January February March 10. Cumulative Total 11. Cum. Utilization % 12. Any other information (Please write in the box) 13. Important instructions for submitting report: 1) In case data is nil for any of the columns for the month, please enter zero '0' (2) Report must be submitted by 20th of the following month by the transporting entity (3) A scanned copy of the signed & stamped report must be uploaded within 7 days from the date of submitting report online as per instructions given for uploading the report. 14. Note: Please note that due to technical reasons, the information sought in columns / rows may have to be rearranged as required while implementing the online reporting system. UPAMANYU CHATTERJEE, Secy. Footnote: Principal regulations were notified vide GSR 340 (E) dated 06-05-2008 and amended vide: i) ii) iii) iv) Vv) vi) vil) F. No. PNGRB/NGPL/REGULATIONS/AMEND-2014 dated 08/08/2014 vii) F. No. L-MISC/VI/I/2007 dated 01-01-2015 and Published by the Controller of Publications, Delhi- 110054.