Skip to content
regulation2014CENTRAL

5.6 Authorizing entities to lay, build, operate or expand city or local natural gas distribution network, Amendment Regulation, 2014

Text

Hid a Ista The Gazette of Grdia EXTRAORDINARY art WiI—avg 4 PART I1]—Section 4 wiftrare & wentfora PUBLISHED BY AUTHORITY a. 109] ag facet, dra, aie 7, 2014/8 17, 1936 No. 109] NEW DELHI, MONDAY, APRIL 7, 2014/CHAITRA 17, 1936 Fatferan ate arpite te Pare as afer wr. &. Sheasitaredtvaishteyaterge4/2013-f-fae.— tetera site srpfte te farrarss are afar, 2006 (2006 a 19) 4t erat 61 are vacd afeaat ar wart wed eu Fetes ste waite tet faftares até unegre freaferfere fafa sara z, AAT: — 1. aftr ara ate sore (1) =a fafrat at fatferae att orate te fafarrs ae (are at eartte opts te faa Acad fart, fate, caveat ar fae Het & fore Hahrat et wrist HAT) aanrert fafa, 2014 Fer STEATI (2) Tacard wags Ff sas wares A atta & sgqer ST 2. datieran ax opiate tte Paras ars (ae aT carta orpies te Pract Aca fears, Frater, cares ar ene wea & foro safaat at wage wear) fafaa, 2008 F— () fafran 7 F— (®) @e (a) & fav, frente at ofaearfta Pear sem, arta : “@q) awe atterat ard faare aa ae dheash ata saat sik Sa-freftet creverst & TETAS sta & fare eras rea duash ety aataeat & fre arereyqa stat - até divasit ate aaaert & fore arareya Ta agt & dom dafera ahnfere Sa & oftaret ar ata wftere sree Pear sree, are : -— uae wfaera, ware wfeera, were wfhtere ste wa at witera wreat For; site (i) are ote ad Ft safer F oem aT us ae a get ad A a oA oe Rare a aT FI Sa orevered ate casts orgaeres tat ox Pevfefee & sqare Pare fear sre, Wad: — (i) 1,000 art Rretrftex & ar ar vas aerac sitters Sat ® fru, dafra shies ar & af Preftttex a 0.65 & gor Fear so; (ii) 1,000 arf feettftex & afere siz 5,000 at Pratitex 8 ae or area aes aa Fae oreaerer 650 Sa-freattex BF; (iii) 5,000 af Pretrftex & afte ahifte aat & fa afte aie aa ® at frettftex at 0.07 & qor fear arom aerd fe era oTETATST 1,800 Sa-Pretftex aq oF wfeerc ser eet A arte & yaa ote aut & cheat sree far sre, qT: — (l) ame dtefterat sae av, fedta ad, qdia ad, weet ad sik Gan at & ota ae ea Tee areas: ste wfaera, care sfaera, aedit wfaera, aed oftere atx we at sfaere ster wom frat at sare ae ofa att; siz . seat a, aeast (sz) [feast -3/4/3781./188/14] are fecreit : qe fafhaat at wath. 196(a) feats 19 ard, 2008 ater aferghra far war ar six aentftra Pear war ar THE PETROLEUM AND NATURAL GAS REGULATORY BOARD NOTIFICATION New Delhi, the 7th April, 2014 F. No. PNGRB/CGD/BID/4/2013-PRE BID.—In exercise of the powers conferred by section 61 of the Petroleum and Natural Gas Regulatory Board Act, 2006 (19 of 2006), the Petroleum and Natural Gas Regulatory Board hereby makes the following regulations, namely :-— 1, Short title and commencement. (1) These regulations may be called the Petroleum and Natural Gas Regulatory Board (Authorising — Entities to Lay, Build, Operate or Expand City or Local Natural Gas Distribution Networks) Amendment Regulations, 2014. (2) They shall come into force on the date of their publication in the Official Gazette. 2. In the Petroleum and Natural Gas Regulatory Board (Authorising Entities to Lay, Build, Operate or Expand City or Local Natural Gas Distribution Networks) Regulations, 2008,— (a) in regulation 7,— (i) in sub-regulation (1),— (A) _ for clause (c), the following shall be substituted, namely:— “(c) Minimum Work Programme for infrastructure for PNG domestic connections and inch- kilometer of pipeline to be laid by the successful bidder Infrastructure for PNG domestic connections.—The Board shall work out the target for infrastructure for PNG domestic connections as five per cent of the households of the respective geographical area to be achieved by the successful bidder during the first five years from the date of grant of authorisation in Schedule D as under, namely :— (i) the successful bidder shall achieve fifteen per cent, fifty per cent, seventy per cent. and one hundred per cent of this target by the end of second year, third year, fourth year and fifth year respectively; and (ii) the Board may consider carry forward of the target from one year to another within the period of five years. Inch-kilometer_of pipeline——The Board shall work out the target for inch-kilometer of pipeline, for which both steel pipeline and MDPE pipeline shall be considered, as per the following, namely:- a for geographical areas having an area of less than or equal to 1,000 square kilometers, product of 0.65 and the area in square kilometers of the respective geographical area; (ii) for geographical areas having an area of more than 1,000 square kilometers and less than or equal to 5,000 square kilometres, product of 0.36 and the area in square kilometres of the respective geographical area subject to a minimum of 650 inch-kilometer of pipeline; (iii) for geographical areas having an area of more than 5,000 square kilometres, product of 0.07 and the area in square kilometres of the respective geographical area subject to a minimum of 1,800 aall inch-kilometer of pipeline. The target for inch-kilometer of pipeline worked out as per the above shall be achieved by the successful bidder during the first five years from the date of grant of authorisation in Schedule D as under, namely :— (i) the successful bidder shall achieve twenty per cent., fifty per cent, eighty per cent, ninety per cent and one hundred per cent of this target by the end of first year, second year, third year, fourth year and fifth year respectively covering all the charge areas; and (ii) the Board may consider carry forward of the target from one year to another within the period of five years.”. Foot Note : Principal regulations were notified vide No. G.S.R.196(E), dated 19th March, 2008 and subsequently Printed by the Manager, Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.