governed by Standard Schedule of dimensions, which is sacrosanct for passenger safety. A F.O.B can be constructed on an island Platform only if there exist a setback distance of 3.66 metres from the F.O.B landing to the edge of the platform. In Pudukkad Railway Station, the said required distance is not available, which is imperative. If the same as to be provided, platform No.2 would have to be widened, for which purpose, the siding track would have to be relocated, alterations have to be made to the signalling arrangements and the existing Railway Quarters will have shifted. The estimated post for such allied preparatory work has estimated over Rs.2 Crore. Due to the huge cost involved and the lesser revenue generated from the said Railway Station, the Railway Administration has decided not to construct of F.O.B at present. The petitioner has no legal right to demand the construction of the F.O.B against the norms/guidelines that are in vogue . Therefore the writ petition is only liable to be dismissed