metres. Therefore, it is evident that the Building Permit was issued after taking into account the existing building. Ext.P2 is the Sanctioned Plan. Ext.P2 describes the building as “Residential Dormitory Building to Existing Commercial Building”. Ext.P2 also has taken into account the plinth area of existing building (664.83 Square metres) and the proposed construction is shown as 654.54 Square metres. Therefore, it is evident that the Building Permit as well as the Sanctioned Plan were issued taking into consideration the existing building also. The Sanctioned Plan states that the Parking Area needed is 4 and Parking Area provided is 5. The petitioner though was permitted to additionally construct 654.54 Square metres, she has actually constructed only 256.50 Square metres only. Therefore, when the petitioner submitted application for regularisation of construction to regularise any other deviation on construction, the parking area should not have been an issue because the petitioner had provided more parking area than the one prescribed in Ext.P2 Sanctioned Plan.