The 1st petitioner claims that he is having right, title and possession over property having an extent of about 2 cents which abuts the National Highway. The respondents have obtained administrative sanctions to construct the Nellayi Lift Irrigation Kadavu Bridge. The petitioner contends that if the bridge is built as per the approved design specifications, it is likely to cause serious road safety issues. Reference is also made to certain communications addressed by the Chief Engineer (Designs) to the Chief Engineer (Bridges). According to the petitioners before opting for the new alignment, the respondents did not conduct any survey of land required for the bridge and also for the approach roads. In the said circumstances, he has lodged Ext.P6 representation before the 2nd respondent. Though various other reliefs are claimed, when the matter came for consideration, the limited prayer sought for by the learned counsel appearing for the petitioners is for an expeditious consideration of Ext.P6 representation in a time-bound manner.