underpass outway to be constructed at Elathur and Vadakkumpad, pursuant to Ext. P9(a). After a detailed study, the CMO reported that as per the site condition, 'Underpass' was not feasible at the location (Panvangad) and that only 'Railway Over Bridge' could be constructed. It is stated that, there will be every possibility of flooding in the road during monsoon season, if the 'under pass' is constructed, as the site is very near to the Beach. Copy of the said report is produced as Ext. P9(b). On reporting the matter to the Government, after considering the factual position, Administrative sanction was given to construct 'Railway Over Bridge' at Pavangad and an amount of 3.66 crores was earmarked for the same.