acquired. Regarding the properties in Kadappuram Village, the said communication would show that there is a thodu and chira on the eastern and western side and that the area is not suitable for construction. A culvert has to be constructed to have access to the road. Certain other thodus are in the balance area, of which, some have to be maintained. Soil is clay mixed with sand. Water table is 0.5 metre below the ground level. Draining of water will be needed during wet season for construction, which will affect the cost of foundation. The said report is concluded with an observation that it is difficult to get land without thodu in it. In sites, where chall, thodu etc. are existing, additional cost will be needed to fill up and maintain them, as the case may be, and provide culverts. There is another communication of the Executive Engineer to the District Collector dated 12.11.2008, produced along with Ext.P11, which would show that the areas identified in Kadappuram and Wemballur Villages are not suitable for construction as they exist now. But, they can be made suitable by executing extra development works, such as earth strengthening works, which involve additional expenditure. The petitioners filed I.A.No.3536/2009 to receive an additional